Square Jean Morin - Playground redesign
Full playground renovation at Square Jean Morin. The project replaces ageing play structures and refurbishes safety floors. The aim is to modernise this outdoor leisure space for children.
Green space · Other
93k €
voted in the 2022 budget
The companies working on it
Contracts matched automatically to this project: check each contract’s object. Each line opens the contract.
MARCHE MULTIATTRIBUTAIREFournitures/pose Jeux Exterieur pour Etablissts lot 1 Multiattr2022 · probable14€MKOMPANFourniture/pose Jeux (everts) : Plastique-lot 3
2022 · probable9€MKOMPANFournitures/pose Jeux (everts) : Bois et Cordages-lot 2
2022 · probable8€MSOLEUSVerif Reglementaire Aires de Jeux Écoles/porte Enfance LT1
2023 · probable1.4€MART PROJECTCSP EP Marché Réalisat°fabricat°pose Aire Jeux Place Nation
2019 · confirmed152k €
Other green space projects · 2022
Square René Le Gall - Partial renovation13th865k €Parc des Buttes-Chaumont (Île de la Falaise) - Diagnostic studies and safety works19th473k €Parc André Citroën - Renovation works15th366k €Boulevard Bourdon - Planting works350k €Arrondissement 12 · View on OpenStreetMap ↗
Amount voted, not final spending: the published accounts do not systematically give the closing balance. Source: CA appendix 2022 · page 34 ↗
