Stairway painting
Painting works in a stairwell of a 9th-district public building. Refurbishment of the finishes of an interior stairwell. The surfaces are repainted to improve maintenance and the visual look of the venue.
Administration · Other
195k €
voted in the 2023 budget
The companies working on it
Contracts matched automatically to this project: check each contract’s object. Each line opens the contract.
MARCHE MULTIATTRIBUTAIRERestoration of paintings and wall murals owned by the City of Paris.2024 · confirmed24€MPAPETERIES PICHONAcbc-mat.dessin Peinture Maternelles et Primaires lot 2
2023 · probable7.2€MENTREPRISE PHILIPPE LASSARATTravaux Remise en Peinture Anticorrosion du Pont de L'ourcq
2023 · confirmed882k €TERIDEALAcbc Travaux Peinture/support Metal Ouvrages ART Parisien
2023 · probable500k €MAISON DUREAUTravaux Église ND Dame de Lorette- Peinture lot 6
2023 · confirmed122k €
Other administration projects · 2023
Energy and thermal upgrades5th5.9€MElectrical installations, functional schema13th1.5€MCatering service restructuring17th1.2€M10th district Town Hall - Facade and window frame restoration10th1.1€MArrondissement 9 · View on OpenStreetMap ↗
Amount voted, not final spending: the published accounts do not systematically give the closing balance. Source: CA appendix 2023 · page 24 ↗
