Tillion College - Kitchen restructuring
Full kitchen modernisation at Germaine Tillion College. Restructuring works on the meal-preparation premises. Includes replacement of cooking equipment and bring-up to standard.
Secondary school · Major projects
167k €
voted in the 2024 budget
The companies working on it
Contracts matched automatically to this project: check each contract’s object. Each line opens the contract.
EDILE CONSTRUCTIONRestructuration Sanitaires Collège Rouault 19e2023 · confirmed647k €MODERN RESTAURATION GESTIONTravaux Restructuration-lot 3-ÉquipementS de Cuisine
2021 · confirmed411k €ETUDES PLURIDISCIPLIN ET CONSEILSÉtudes pour la rénovation des cuisines et la mise aux normes d'accessibilité d'une crèche collective.
2024 · confirmed154k €REOLIAN MULTITECRestructuration Cuisine Crèche Rigoles 20e
2022 · confirmed142k €SOGETHECTravaux Restructuration Laverie Collège Poquelin 1ER
2023 · confirmed67k €
Other secondary school projects · 2024
Gustave Flaubert College - Kitchen restructuring13th1.7€MAimé Césaire College - Kitchen and laundry adaptations18th681k €Alviset and Queneau College kitchens - Renovation5th505k €Victor Hugo College - Open OASIS schoolyard, Lissac plot279k €Arrondissement 12 · View on OpenStreetMap ↗
Amount voted, not final spending: the published accounts do not systematically give the closing balance. Source: CA appendix 2024 · page 33 ↗
