Swimming pool · 16e
Piscine d'Auteuil
Ordered (contract ceilings)
910k €
Deliberations 1996–2018
3
Contracts signed for this place910 k €
Modernisation Total des Locaux Piscine D'auteuilLA LOUISIANE · 2023805 k €Ventilation Piscine D'auteuil 1 RTE des Lacs de PassyTHERMI FLUIDES · 202252 k €Rénovation du Système SSI à la Piscine D'auteuil 75016AMPERELEC · 202133 k €Show one more contract
Marché de travaux pour la modernisation d'un compresseur de plongée à la piscine d'Auteuil dans le 16eBCH COMPRESSEURS · 202520 k €Maximum amount set in the contract, not the final spend: what was actually paid on each contract is not published by the City. Each line links to the contract record.
Key moments
APRIL 1996first technical works project voted on the facilityThe Council approves the principle of climate-engineering works at the pool and authorizes the Mayor to sign the contract.
JULY 1998second technical works project two years laterThe Council approves the principle of refurbishing the filtration and electrical systems, two contracts authorized.
JULY 2018twenty years later, a new call from elected officialsSeveral elected officials from the 16th arrondissement table a motion (vœu) concerning the renovation of the pool.
AI reading of 3 documents out of the 842 returned by the search — each line links to its deliberation.
Sources
Conseil de Paris (Débat-Délibs) ↗ · Bulletin municipal officiel (Gallica/BnF) ↗ · CA annexes, Ville de Paris
Same kind