Swimming pool · 14e
Piscine Didot
Ordered (contract ceilings)
480k €
Deliberations 2022–2022
1
Contracts signed for this place480 k €
TX de Réfection du Carrelage de la Piscine DidotENTREPRISE BAILLE · 2013240 k €M.subs Travaux Mise Conformite Filtration Piscine DidotTECHNIQUE FRANCAISE DE L EAU · 201375 k €Decapage Supports Bassin Piscine Didot 14eENTREPRISE BAILLE · 201360 k €Show the 2 other contracts
M. Subs. Chloramines Piscine DidotTECHNIQUE FRANCAISE DE L EAU · 201357 k €Lot 1 : Remplacement Casiers Vestiaires Piscine Didot 75014NAVIC · 201648 k €Maximum amount set in the contract, not the final spend: what was actually paid on each contract is not published by the City. Each line links to the contract record.
Key moments
FEBRUARY 2022first and only document identified for this locationThe Council examines the signing of a metropolitan subsidy agreement aimed at improving the energy performance of the Piscine Didot (targeted reduction in energy/water consumption and greenhouse gas emissions).
AI reading of 1 documents out of the 1403 returned by the search — each line links to its deliberation.
Sources
Conseil de Paris (Débat-Délibs) ↗ · Bulletin municipal officiel (Gallica/BnF) ↗ · CA annexes, Ville de Paris
Same kind



