Noisy-le-Grand
Aménagement des territoires et habitat
In 2024, Noisy-le-Grand spent 8.0 M€ on this. That is €113 per inhabitant.
Against towns of the same size
−0.1 pt Noisy-le-Grand devotes 6.9% of its operating budget to this; the median for towns of 50,000 to 100,000 inhabitants is 7%.
Ranked 44 of 81 by share of budget.In euros per inhabitant: €113, against €102 for the median (+11 %).
What for?
Urban green spaces3.7 M€
Street lighting1.4 M€
Shared services1.3 M€
Other urban development programmes937 k€
Authority's own property portfolio335 k€
Shared services246 k€
Urban regeneration policy70 k€
Spent on what?
Basic pay1.4 M€
Land1.3 M€
Energy — electricity1.1 M€
Pension fund contributions490 k€
Networks460 k€
Charges for services rendered423 k€
Other allowances401 k€
Non-permanent staff — pay376 k€
Social security agency contributions351 k€
Other external services — other339 k€
Maintenance261 k€
Legal deeds and litigation costs172 k€
Other types of spending885 k€
Towns of the same size, around it by share of budget
2024 operating expenditure, as the town voted it by function. Source: DGFiP — balances comptables, présentation croisée nature-fonction. The comparison is first on the share of the operating budget — the reading that does not depend on how wealthy the town is — then on euros per inhabitant, against the median of towns in the same DGFiP population band. Transfers to the inter-municipal body are excluded on both sides.