Skip to main content
Qipu

Sports centre Point du Jour, Mesnil Saint-Didier annex - Roof waterproofing repair

In 2022, the City of Paris budgeted €180k for "Sports centre Point du Jour, Mesnil Saint-Didier annex - Roof waterproofing repair" (, 16th arrondissement). Source: City of Paris, localised investments in the administrative account, data as of 9 February 2026.

Illustration générique équipement culturel
Illustration
© Blancard, Hippolyte (1843 - 1924), photo

Roof waterproofing repair at the Point du Jour leisure centre. Roof renovation to stop water leaks. The intervention protects the building and maintains the activities held there.

Cultural facility · Other

180k €
voted in the 2022 budget
16th arrondissement · 13th project of 29 that year

The companies working on it

Contracts matched automatically to this project: check each contract’s object. Click a line to open the contract.

ETANDEXAcbc Travaux Etancheite des Bassins-plan D'eau-fontaines
2022 · probable
4€M
SNIDAROTravaux Impermeabilisat°etancheite Carrelage Bassins/lot 6
2022 · confirmed
2€M
LA LOUISIANEVentilation-system modernisation at Saint-Didier School in the 16th.
2024 · confirmed
945k €
ETANCHECOEtancheite Zone 2 Cour GS Eugenie Cotton 19e
2022 · confirmed
666k €

Other cultural facility projects · 2022

Sainte-Marie-Madeleine Church - Restoration of all facades8th3.3€MSaint-Eustache Church - Entrance facade restoration, miscellaneous works2.9€MSaint-Louis-en-l'Île Church - Roofs and facades1.4€MSaint-Gervais and Saint-Protais Church - Bell tower and north arm of the transept4th1.3€M

Route du Point du Jour à Bagatelle 75116 Paris · View on OpenStreetMap ↗
Amount voted, not final spending: the published accounts do not systematically give the closing balance. Source: CA appendix 2022 · page 48