Tournefeuille
Aménagement des territoires et habitat
In 2024, Tournefeuille spent 1.4 M€ on this. That is €46 per inhabitant.
Against towns of the same size
−3.1 pt Tournefeuille devotes 4% of its operating budget to this; the median for towns of 20,000 to 50,000 inhabitants is 7%.
Ranked 289 of 342 by share of budget.In euros per inhabitant: €46, against €92 for the median (−50 %).
What for?
Street lighting712 k€
Urban green spaces606 k€
Other urban development programmes32 k€
Shared services20 k€
Traveller site14 k€
Other development programmes5 k€
Social housing500 €
Spent on what?
Joint bodies440 k€
Service contracts327 k€
Energy — electricity252 k€
Water and wastewater77 k€
Other non-stocked supplies58 k€
Fuel54 k€
Small equipment supplies51 k€
Vehicles and rolling stock42 k€
Other private bodies32 k€
Networks22 k€
Apprentice pay13 k€
Equipment rentals — other11 k€
Other types of spending11 k€
Towns of the same size, around it by share of budget
2024 operating expenditure, as the town voted it by function. Source: DGFiP — balances comptables, présentation croisée nature-fonction. The comparison is first on the share of the operating budget — the reading that does not depend on how wealthy the town is — then on euros per inhabitant, against the median of towns in the same DGFiP population band. Transfers to the inter-municipal body are excluded on both sides.