live.staticflickr.com · Bing · UNVERIFIEDSunset Reservoir is the western end of the city's water system, and its record runs from construction to a public quarrel about how it was planned. The Public Utilities Commission's report on the 1933 bond issue lists "Sunset Reservoir and Connecting Pipes" among the contracts let under Public Works Administration Docket 1510, and the history of the municipal water department traces the twenty-mile Sunset Pipeline, of 78- and 60-inch pipe, running through the Lake Merced Pumping Station to feed it. A 1957-58 water department report puts numbers to that: the Lake Merced pumps boosted an average of 24.8 million gallons a day off the Sunset Pipeline, 16.0 million of it to this reservoir and 8.8 million to Sutro. A 1979 environmental report for San Andreas Pipeline No. 3 proposed running a 66-inch main 62,200 feet from the filtration plant at Millbrae to the reservoir, partly because flows here were being reduced at peak demand by suburban users drawing on existing transmission capacity. By 2001 the commission's own capital programme was recording the North Basin's 1938 roof, its significant concrete expansion and its circulation problems. And when the Public Utilities Infrastructure Task Force reviewed a sample of the city's capital projects, it picked two — the Calaveras Dam and this reservoir — and concluded of the North Basin embankment, foundation stabilisation and seismic upgrade that the project "was not sensibly planned".
1949 24th Ave · City-owned · parcel 2107001 · District 4 · City Facilities registry
No city spending is recorded against this place by name. San Francisco publishes contracts, bond items and vendor payments at project level, and none of them names this site — so there is no figure to show, rather than a figure of zero.
Run by the Public Utilities Commission (water, power, sewer), whose whole-department budget is $1.8B across 2,679 staff (FY2025) — citywide, not this place’s own. The City does not publish a running cost per building.
An environmental report for a 66-inch pipeline proposed to increase flows to the reservoir.
San Andreas pipeline no. 3, [draft] environmental impact report · 1979 ↗Internet Archive — San Francisco Public Library partnership scansA Lake Merced study weighing diversion of the reservoir's dewatering into the lake.
Feasibility evaluation of alternatives to raise Lake Merced : draft ↗Internet Archive — San Francisco Public Library partnership scansA history of the municipal water system, tracing the Sunset Pipeline that feeds the reservoir.
San Francisco water & power : a history of the Municipal Water Department and Hetch Hetchy System · 1985 ↗Internet Archive — Democracy's LibraryThe commission's capital programme, recording the North Basin's 1938 roof and circulation problems.
City Distribution Division capital improvement program driven by facility conditions, May 7, 2001 · 2001 ↗Internet Archive — San Francisco Public Library partnership scans
See 4 more documents
A water department report giving the daily volumes pumped to the reservoir from the Sunset Pipeline.
Report of the San Francisco Water Department ↗Internet Archive — San Francisco Public Library partnership scansThe task force's engineering correspondence on the reservoir upgrade it was asked to review.
San Francisco Public Utilities Infrastructure Task Force : final report : June 1, 2000-June 17, 2002 · 2000 ↗Internet Archive — Democracy's LibraryThe infrastructure task force's report, judging the reservoir's stabilisation and seismic project poorly planned.
Final report : June 1, 2000-June 17, 2002 / San Francisco Public Utilities Infrastructure Task Force · 2000 ↗Internet Archive — San Francisco Public Library partnership scansA commission report listing the reservoir and its connecting pipes among 1933 bond contracts.
Report of the San Francisco Public Utilities Commission · 1933 ↗Internet Archive — San Francisco Public Library partnership scans