Wikimedia Commons · Pi.1415926535 · CC BY-SA 3.0Potrero is one of Muni's two trolley-coach yards, and its record is of a building modified for each new generation of vehicle. A 1984 staff paper states the problem plainly: the railway's first articulated trolley coaches were due in 1988-89, neither Presidio nor Potrero could handle them for storage or maintenance, and so preliminary modification work at Potrero had to begin before early 1985 — Potrero would be ready by 1988, ahead of Presidio. The federal transit programme for 1986-87 carries "Potrero Division Modifications" at $3,413,200, of which $2,730,560 was federal and $682,640 the local match. The work was not always well done: the Budget Analyst's management audit of Muni cites costly design flaws in the renovation, among them a three-post lift for the new 60-foot articulated coaches built too close to a bearing wall and an electrical circuit. The same audit uses the division to illustrate a staffing dispute — on one April morning in 1996 Potrero reported ten transit runs undispatched for want of an operator, while employing thirteen operators full time in non-driving duties. The yard has long been where Muni trains, too, running both a supervisory course and a transit fleet training programme sponsored by the Board of Education. A permit to erect a four-storey bus maintenance facility here, declared at $400 million, was withdrawn in 2023 and filed again in 2024.
2500 Mariposa St · City-owned · 192,000 sq ft · parcel 3971001 · District 9 · City Facilities registry
No city spending is recorded against this place by name. San Francisco publishes contracts, bond items and vendor payments at project level, and none of them names this site — so there is no figure to show, rather than a figure of zero.
Run by the Municipal Transportation Agency (Muni), whose whole-department budget is $1.5B across 6,381 staff (FY2025) — citywide, not this place’s own. The City does not publish a running cost per building.
A management audit citing costly design flaws in the division's renovation, and its undispatched runs.
Management audit of the San Francisco Municipal Railway ↗Internet Archive — San Francisco Public Library partnership scansThe federal transit programme listing $3,413,200 for Potrero Division modifications, with its local match.