Supplier of Acoua · Transport and vehicles
Mahorais Général Électrique SARL
Mahorais Général Électrique SARL holds one public contract awarded by Acoua in 2025. That is 2% of the value of the contracts the town awarded in 2025.
head office in Chiconi (976) · Travaux d'installation électrique dans tous locaux · SIREN 888085792
€163k
at most, over the whole term of the contracts awarded by Acoua in 2025
Its contracts in Acoua
Maximum amount of each contract, over its whole term: not what was paid.
Rénovation de l’éclairage public : village de M’tsangadoua2025 · maximum over 18 months · at most ~€109k a year on average · Simplified procedure€163k