Public contracts of Allaire · 2025 · Construction and buildings
Gros oeuvre extension / réhabilitation médiathèque
That is at most ~€80k a year on average: a maximum too.
Company selected
Allaire Pierre MaconnerieTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office Allaire (56350) · SIREN 992622548A contract awarded to 2 holders; above, the main holder. With it: Le Masle Rio. The amount is the whole contract’s: the DECP does not publish each holder’s share.
The competition
Median for this procedure in 2025: 3 bids, across 49692 comparable contracts. Simplified procedure · awarded to 2 companies
Open data gives the contract holder and the number of bids. The identity of unsuccessful bidders is not published.
Number 13 by amount of the 29 contracts Allaire published for 2025. It belongs to the policy Culture, sport and youth.
Other contracts of Allaire Pierre Maconnerie in Allaire
Réhabilitation de l’immeuble allée du Parc : gros œuvre2025 · maximum over 12 months225€kContract details (procedure, price, amendments, lots)
Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds
Price : Unitaire
Published amendments : 3
Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.