Skip to main content

Public contracts of Altkirch · 2023 · Construction and buildings

Réhabilitation de l’École Elementaire les Tuileries

Gros oeuvre

€116k
maximum contract amount over 2 years — what was paid on it is not published
Signed on 22 June 2023 · ended around June 2025 · 2 yrs

That is at most ~€58k a year on average: a maximum too.

Company selected

Altkirch ConstructionTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office Carspach (68130) · headcount 10 to 19 employees · SIREN 802989038

Number 15 by amount of the 33 contracts Altkirch published for 2023.

Other contracts of Altkirch Construction in Altkirch

Aménagement d’un parc PUBLICLot 01 A : Gros-Oeuvre/Béton…2020 · maximum over 5 months90€kMise aux normes PMR du Club House et Construction d’une aire de jeu…2019 · maximum over 5 months20€kMise aux normes PMR du Club House et Construction d’une aire de jeu…2019 · maximum over 5 months4€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Mixte

Published amendments : 1

Subcontracting declared : yes

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.