Supplier of Andernos-les-Bains · Construction and buildings
Eole Thermie
Eole Thermie holds 3 public contracts awarded by Andernos-les-Bains between 2023 and 2024. That is 1% of the value of the contracts the town awarded over the period.
head office in Saint-Laurent-Medoc (33) · 10 to 19 employees · Travaux d'installation d'eau et de gaz en tous locaux · SIREN 922578851
Its contracts in Andernos-les-Bains
Maximum amount of each contract, over its whole term: not what was paid.
Lot n10 chauffage, ventilation, climatisation construction d’une base…2024 · maximum over 12 months · Simplified procedure€79kConstruction CTM / lot n10 : chauffage, ventilation…2023 · maximum over 12 months · Simplified procedure€80kLot N10 chauffage, ventilation, climatisation PM2023 · maximum over 10 months · Simplified procedure€60kYear by year
Elsewhere in France
Eole Thermie holds contracts in 2 towns, worth €419k at award.