Public contracts of Annecy · 2021 · Construction and buildings
Création de passerelles mode doux temporaires sur le Thiou et canal du vassé
That is at most ~€615k a year on average: a maximum too.
Company selected
Bouchet Construction MetalliqueFabrication de structures métalliques et de parties de structures · registered office Annecy (74000) · headcount 20 to 49 employees · SIREN 405200494A contract awarded to 2 holders; above, the main holder. With it: AER Architectes. The amount is the whole contract’s: the DECP does not publish each holder’s share.
Number 7 by amount of the 205 contracts Annecy published for 2021.
Contract details (procedure, price, amendments, lots)
Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds
Price : Révisable
Published amendments : none
Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.