Skip to main content

Public contracts of Annecy · 2022 · Construction and buildings

Déconstruction de 5 bâtiments sur le site du centre de loisirs des puisots

€65k
maximum contract amount over 1 month — what was paid on it is not published
Signed on 3 January 2022 · ended around February 2022 · 1 month

Company selected

Razel-BECConstruction d'autres ouvrages de génie civil n.c.a. · registered office Saclay (91400) · headcount 2,000 to 4,999 employees · SIREN 562136036

Number 130 by amount of the 163 contracts Annecy published for 2022.

Other contracts of Razel-BEC in Annecy

Travaux de désamiantage2026 · maximum over 2 months162€kDéconstruction 5 bâtiments site centre loisirs puisots2021 · maximum over 1 month103€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme et actualisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.