Skip to main content

Public contracts of Annecy · 2024 · Construction and buildings

Travaux de remplacement de la GTB du conservatoire seynod

€44k
maximum contract amount over 1 month — what was paid on it is not published
Signed on 26 April 2024 · ended around May 2024 · 1 month

Company selected

Etude Realisation Électrique ParmelanFabrication de matériel de distribution et de commande électrique · registered office Villaz (74370) · headcount 10 to 19 employees · SIREN 353559800

Number 222 by amount of the 228 contracts Annecy published for 2024. It belongs to the policy Culture, sport and youth.

Other contracts of Etude Realisation Électrique Parmelan in Annecy

GTB école élémentaire du parmelan2026 · maximum over 4 months49€kTravaux GTB de la piscine patinoire jean Regis2024 · maximum over 6 months103€kEnsemble de régulation chauffage2021 · maximum over 2 months70€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Forfaitaire

Published amendments : 1

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.