Supplier of Arcachon · Construction and buildings
Groupe Charbonnier Metallerie
Groupe Charbonnier Metallerie holds 2 public contracts awarded by Arcachon between 2019 and 2024. That is 1% of the value of the contracts the town awarded over the period.
head office in La Teste-De-Buch (33) · 10 to 19 employees · Fabrication de structures métalliques et de parties de structures · SIREN 799006432
Its contracts in Arcachon
Maximum amount of each contract, over its whole term: not what was paid.
Conception, fabrication et pose de tonnelles en structure métallique2024 · maximum over 4 years · at most ~€125k a year on average · Simplified procedure€500kConstruction d’un muret de clôture et d’une grille métallique au Parc…Serrurerie · 2019 · maximum over 4 months · Simplified procedure€64kYear by year
Elsewhere in France
Groupe Charbonnier Metallerie holds contracts in 2 towns, worth €859k at award.