Skip to main content

Groupe Charbonnier Metallerie

Groupe Charbonnier Metallerie holds 2 public contracts awarded by Arcachon between 2019 and 2024. That is 1% of the value of the contracts the town awarded over the period.

head office in La Teste-De-Buch (33) · 10 to 19 employees · Fabrication de structures métalliques et de parties de structures · SIREN 799006432