Skip to main content

Public contracts of Arnouville · 2025 · Construction and buildings

Installation de chantier, démolition, gros œuvre, isolation, façade, couverture, étanchéité

€2M
maximum contract amount over 18 months — what was paid on it is not published
Signed on 3 September 2025 · running until about March 2027 · 18 months
Ongoing5 Mar 2027

That is at most ~€1.3M a year on average: a maximum too.

Company selected

Établissements A. PhilipponConstruction d'autres bâtiments · registered office Andilly (95580) · headcount 20 to 49 employees · SIREN 718203235

The competition

8 bids received

Median for this procedure in 2025: 3 bids, across 49692 comparable contracts. Simplified procedure · awarded to 1 company

Open data gives the contract holder and the number of bids. The identity of unsuccessful bidders is not published.

Number 4 by amount of the 26 contracts Arnouville published for 2025.

Other contracts of Établissements A. Philippon in Arnouville

Démolition, gros œuvre, carrelage, étanchéité, menuiseries, cloisons…2025 · maximum over 14 months11.5€MExtension et réhabilitation de l’école maternelle Anna Fabre : phase 22025 · maximum over 12 months2.5€MDémolition, gros œuvre, isolation, façade, couverture, étanchéité…2025 · maximum over 1 month2.2€M
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Forfaitaire

Published amendments : none

Subcontracting declared : no

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.