Skip to main content

Public contracts of Bagnères-de-Bigorre · 2021 · Public administration

Maîtrise d’oeuvre pour la réhabilitation de l’école Carnot

€50k
maximum contract amount over 18 months — what was paid on it is not published
Signed on 21 April 2021 · ended around October 2022 · 18 months

That is at most ~€33k a year on average: a maximum too.

Company selected

Peretto et Peretto ArchitectesActivités d'architecture · registered office Lourdes (65100) · headcount 3 to 5 employees · SIREN 853291144

Number 8 by amount of the 14 contracts Bagnères-de-Bigorre published for 2021.

Other contracts of Peretto et Peretto Architectes in Bagnères-de-Bigorre

Maîtrise d’oeuvre pour la construction d’une gendarmerie a la mongie2020 · maximum over 12 months47€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme et actualisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.