Skip to main content

Public contracts of Bar-le-Duc · 2023 · Construction and buildings

Travaux d’habillage et de remplacement du système de traitement d’air de la salle des fêtes de Bar-le-Duc

Démolition · Gros oeuvre

€27k
maximum contract amount over 4 months — what was paid on it is not published
Signed on 27 March 2023 · ended around July 2023 · 4 months

Company selected

Eric PaymalTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office Bar-Le-Duc (55000) · headcount 10 to 19 employees · SIREN 434204459

Number 28 by amount of the 38 contracts Bar-le-Duc published for 2023. It belongs to the policy Culture, sport and youth.

Other contracts of Eric Paymal in Bar-le-Duc

Construction d’un hall bouliste : terrassement, fondations, gros œuvre…2023 · maximum over 12 months491€kTravaux d’habillage et de remplacement du système de traitement d’air…2023 · maximum over 4 months26€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Révisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.