Skip to main content

Public contracts of Bastia · 2018 · Construction and buildings

Théâtre de verdure, liaison verticale avec le vieux port et jardin Romieu

€1.8M
maximum contract amount over 13 months — what was paid on it is not published
Signed on 23 November 2018 · ended around December 2019 · 13 months

That is at most ~€1.6M a year on average: a maximum too.

Company selected

SNC VendasiConstruction d'autres bâtiments · registered office Biguglia (20620) · headcount 20 to 49 employees · SIREN 316141993

A contract awarded to 5 holders; above, the main holder. With it: SOC Brando BTP, Entreprise Natali, Peretti Travaux Speciaux-Haute Corse (P-T-S-HC), Contact Construction. The amount is the whole contract’s: the DECP does not publish each holder’s share.

The largest of the 5 contracts Bastia published for 2018. It belongs to the policy Culture, sport and youth.

Other contracts of SNC Vendasi in Bastia

Aménagement du carrefour du palais de justice et de l’espace Gaudin2019 · maximum over 13 months924€kRestructuration du centre ancien, îlot du Puntettu : déconstructions…2019 · maximum over 2.5 years772€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.