Supplier of Bert · Construction and buildings
M.P.B
M.P.B holds one public contract awarded by Bert in 2024. That is 63% of the value of the contracts the town awarded in 2024.
head office in Saint-Remy-En-Rollat (03) · 3 to 5 employees · Travaux de maçonnerie générale et gros œuvre de bâtiment · SIREN 421994211
€105k
at most, over the whole term of the contracts awarded by Bert in 2024
Its contracts in Bert
Maximum amount of each contract, over its whole term: not what was paid.
Aménagement de salles pour les associations2024 · maximum over 6 months · Simplified procedure€105k