Supplier of Besançon · Construction and buildings
F2G
F2G holds 3 public contracts awarded by Besançon between 2021 and 2025.
head office in Montferrand-Le-Chateau (25) · 1 or 2 employees · Travaux d'installation d'eau et de gaz en tous locaux · SIREN 395158116
€83k
at most, over the whole term of the contracts awarded by Besançon in 2025
Its contracts in Besançon
Maximum amount of each contract, over its whole term: not what was paid.
Mise en accessibilité ad ap de l’école et création d’un nouveau…Chauffage ventilation · 2025 · maximum over 10 months · Simplified procedure€83kTx réno énergétique crèche battant l102024 · maximum over 11 months · Simplified procedure€294kTravaux aménagement de locaux destinés aux activités nautiques…Chauffage ventilation · 2021 · maximum over 3 years · at most ~€65k a year on average · Simplified procedure€184kYear by year
€€184k in 2021 · €€294k in 2024 (the highest) · €€83k in 2025
Click a year to see its amount.