Supplier of Besançon · Construction and buildings
M.C.F.
M.C.F. holds 2 public contracts awarded by Besançon in 2023. That is 1% of the value of the contracts the town awarded in 2023.
head office in La Chapelle-Sur-Furieuse (39) · 20 to 49 employees · Travaux de couverture par éléments · SIREN 819423245
€385k
at most, over the whole term of the contracts awarded by Besançon in 2023
Its contracts in Besançon
Maximum amount of each contract, over its whole term: not what was paid.
Rénovation thermique de l’école élémentaire ViotteBardage bois · 2023 · maximum over 2 years · at most ~€137k a year on average · Simplified procedure€274kRénovation thermique de l’école élémentaire ViotteCharpente bois et métallique Couverture Zinguerie Etanchéité · 2023 · maximum over 2 years · at most ~€56k a year on average · Simplified procedure€111k