Public contracts of Besançon · 2022
Modulaires provisoires école kergomard
Number 232 by amount of the 287 contracts Besançon awarded in 2022.
Contract · Construction and Bâtiment · carried out in 25056
90k €
contract ceiling — what was paid on it is not published
Who won it
AltempoSIREN 450252630The competition
Number of bids not published for that year: the field is only systematic from 2024.
Adapted procedure · awarded to 1 company
Open data publishes the winner and the bid count — never the identity of unsuccessful bidders.
The form of the contract
PriceFerme
Published amendments1
Other contracts of Altempo in Besançon
Travaux de mise en place location et enlèvement de locaux provisoires a l école maternelle boulloche2022162k€Modulaires provisoires école kergomard2021192k€Travaux de mise en place location et enlèvement de locaux provisoires a l école maternelle boulloche2021151k€Marchés de plus de 40 000 € HT déclarés à la notification (DECP) : montants des contrats, pas les paiements. Les plus petits marchés ne sont pas publiés ; les montants manifestement erronés sont écartés.