Skip to main content

Public contracts of Besançon · 2025 · Construction and buildings

Rénovation extension de l’école de la butte a Besançon

Gros œuvre

€909k
maximum contract amount over 23 months — what was paid on it is not published
Signed on 14 May 2025 · running until about April 2027 · 23 months
Ongoing14 Apr 2027

That is at most ~€474k a year on average: a maximum too.

Company selected

Albizzati Pere et FilsTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office Danjoutin (90400) · headcount 50 to 99 employees · SIREN 535720122

Number 13 by amount of the 226 contracts Besançon published for 2025. It belongs to the policy Schools.

Other contracts of Albizzati Pere et Fils in Besançon

Rénovation extension de l’école de la butte a Besançon2025 · maximum over 23 months370€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Forfaitaire

Published amendments : 3

Subcontracting declared : yes

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.