Skip to main content

Public contracts of Besançon · 2021 · Construction and buildings

Travaux de rénovation énergétique de l’école maternelle kennedy

Rénovation des façades · ITE · Étanchéité

€244k
maximum contract amount over 14 months — what was paid on it is not published
Signed on 26 October 2021 · ended around December 2022 · 14 months

That is at most ~€209k a year on average: a maximum too.

Company selected

Société Doloise de PeintureTravaux de peinture et vitrerie · registered office Foucherans (39100) · headcount 50 to 99 employees · SIREN 393490768

Number 45 by amount of the 183 contracts Besançon published for 2021. It belongs to the policy Schools.

Other contracts of Société Doloise de Peinture in Besançon

Tx construction crèche orchamps2025 · maximum over 19 months197€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme

Published amendments : 2

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.