Travaux pour la réhabilitation lourde de l’école élémentaire paul bert

Plâtrerie peinture

€293k
maximum contract amount over 2.5 years — what was paid on it is not published
Signed on 19 June 2025 · running until about November 2027 · 2.5 yrs
Ongoing19 Nov 2027

That is at most ~€121k a year on average: a maximum too.

Company selected

Entreprise Bisontine de PeintureTravaux de plâtrerie · registered office Serre-Les-Sapins (25770) · headcount 10 to 19 employees · SIREN 423363548

Number 62 by amount of the 226 contracts Besançon published for 2025. It belongs to the policy Schools.

Other contracts of Entreprise Bisontine de Peinture in Besançon

Travaux de mise en sécurité de la grande halle de la friche artistique2025 · maximum over 10 months181€kTravaux locaux outdoor2023 · maximum over 14 months501€kRénovation thermique de l’école élémentaire Viotte2023 · maximum over 2 years266€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Forfaitaire

Published amendments : none

Subcontracting declared : no

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.