Supplier of Beynac-et-Cazenac · Construction and buildings
Les Peintures du Lot
Les Peintures du Lot holds one public contract awarded by Beynac-et-Cazenac in 2024. That is 3% of the value of the contracts the town awarded in 2024.
head office in Anglars-Nozac (46) · 6 to 9 employees · Travaux de peinture et vitrerie · SIREN 491670543
€42k
at most, over the whole term of the contracts awarded by Beynac-et-Cazenac in 2024
Its contracts in Beynac-et-Cazenac
Maximum amount of each contract, over its whole term: not what was paid.
Construction and buildings (no title given)2024 · maximum over 18 months · at most ~€28k a year on average · framework agreement: a maximum envelope, not spending · Simplified procedure€42k