Public contracts of Boissy-sous-Saint-Yon · 2019 · Professional services

Maîtrise d’oeuvre portant sur les travaux de mise aux normes accessibilité et rénovation de l’Hôtel de ville de Boissy-sous-Saint-Yon

€16k
maximum contract amount over 19 months — what was paid on it is not published
Signed on 22 February 2019 · ended around September 2020 · 19 months

That is at most ~€10k a year on average: a maximum too.

Who won it

—SIREN 212284818

A contract awarded to 2 holders; above, the main holder. With it: Ercb Architecture. The amount is the whole contract’s: the DECP does not publish each holder’s share.

Number 2 by amount of the 2 contracts Boissy-sous-Saint-Yon published for 2019.

Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme et actualisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.