Skip to main content

Public contracts of Boissy-sous-Saint-Yon · 2023 · Construction and buildings

Restructuration et extension du pôle scolaire : terrassement, gros œuvre et maçonnerie

€283k
maximum contract amount over 2.5 years — what was paid on it is not published
Signed on 26 December 2023 · ended around June 2026 · 2.5 yrs

That is at most ~€113k a year on average: a maximum too.

Company selected

Sky WallTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office Cerny (91590) · headcount 10 to 19 employees · SIREN 798030011

Number 2 by amount of the 12 contracts Boissy-sous-Saint-Yon published for 2023. It belongs to the policy Schools.

Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Révisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.