Supplier of Bollène · Construction and buildings
Drim Construction
Drim Construction holds 2 public contracts awarded by Bollène in 2024. That is 1% of the value of the contracts the town awarded in 2024.
head office in Nimes (30) · Travaux de montage de structures métalliques · SIREN 913415261
€88k
at most, over the whole term of the contracts awarded by Bollène in 2024
Its contracts in Bollène
Maximum amount of each contract, over its whole term: not what was paid.
CharpenteISOL ext GYMN eluard Bollène · 2024 · maximum over 4 months · Simplified procedure€48kIsolation des façades et extension du gymnase Paul Eluard à BollèneTravaux de charpente et de couverture et travaux connexes · 2024 · maximum over 3 months · Simplified procedure€40kElsewhere in France
Drim Construction holds contracts in 2 towns, worth €385k at award.