Supplier of Bosmie-l'Aiguille · Construction and buildings
CF Électricité
CF Électricité holds one public contract awarded by Bosmie-l'Aiguille in 2024. That is 5% of the value of the contracts the town awarded in 2024.
head office in Limoges (87) · 6 to 9 employees · Travaux d'installation électrique dans tous locaux · SIREN 527842066
Its contracts in Bosmie-l'Aiguille
Maximum amount of each contract, over its whole term: not what was paid.
Réhabilitation extension de l’orangerie en salle culturelle2024 · maximum over 12 months · Simplified procedure€72kElsewhere in France
CF Électricité holds contracts in 2 towns, worth €172k at award.