Skip to main content

Public contracts of Bourg-de-Péage · 2020 · Construction and buildings

Construction d’un préau au centre aéré Papelissier

€28k
maximum contract amount over 2 months — what was paid on it is not published
Signed on 22 October 2020 · ended around December 2020 · 2 months

Company selected

Grangier SecovalTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office Le Pouzin (07250) · headcount 20 to 49 employees · SIREN 385820436

Number 7 by amount of the 13 contracts Bourg-de-Péage published for 2020.

Other contracts of Grangier Secoval in Bourg-de-Péage

Transformation de l’école maternelle Pagnol en école primaire avec…2018 · maximum over 13 months115€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme et actualisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.