Skip to main content

Public contracts of Bourges · 2024 · Construction and buildings

Construction d’un centre municipal de santé

Couverture bardage zinc

€152k
maximum contract amount over 15 months — what was paid on it is not published
Signed on 17 October 2024 · ended around January 2026 · 15 months

That is at most ~€121k a year on average: a maximum too.

Company selected

S.E.B.Travaux de couverture par éléments · registered office Saint-Florent-Sur-Cher (18400) · headcount 10 to 19 employees · SIREN 817490972

Number 58 by amount of the 119 contracts Bourges published for 2024.

Other contracts of S.E.B. in Bourges

Construction d’un centre municipal de santé2024 · maximum over 12 months136€kRéfection de l’étanchéité de la couverture du pavillon d’Auron2023 · maximum over 3 months366€kTEGR 2022 2023 2024-étanchéité bardage2022 · maximum over 3.5 years370€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Forfaitaire

Published amendments : 4

Subcontracting declared : yes

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.