Skip to main content

Public contracts of Bourges · 2020 · Energy

Construction d’une maison de santé multidisciplinaire au Prado

Électricité courants forts courants faibles

€75k
maximum contract amount over 16 months — what was paid on it is not published
Signed on 27 October 2020 · ended around February 2022 · 16 months

That is at most ~€57k a year on average: a maximum too.

Company selected

Construction Electrotechnique du Bat (Cebat 2)Travaux d'installation électrique dans tous locaux · registered office Bourges (18000) · headcount 20 to 49 employees · SIREN 451235451

Number 37 by amount of the 51 contracts Bourges published for 2020. It belongs to the policy Health and social care.

Other contracts of Construction Electrotechnique du Bat (Cebat 2) in Bourges

Travaux entretien grosses réparations bâtiments2026 · maximum over 3 years1.6€MSystème de sécurité incendie2026 · maximum over 6 months142€kMusée estève travaux de mise en conformité électrique…2024 · maximum over 9 months100€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme et actualisable

Published amendments : 2

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.