Skip to main content

Public contracts of Bourges · 2025 · Construction and buildings

Groupe scolaire gibjoncs rénovation du bâtiment périscolaire paul arnault

Carrelage faïence

€41k
maximum contract amount over 19 months — what was paid on it is not published
Signed on 28 July 2025 · running until about February 2027 · 19 months
Ongoing26 Feb 2027

That is at most ~€26k a year on average: a maximum too.

Company selected

SAS CazinTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office Les Aix-D'Angillon (18220) · headcount 20 to 49 employees · SIREN 391981461

Number 80 by amount of the 84 contracts Bourges published for 2025. It belongs to the policy Schools.

Other contracts of SAS Cazin in Bourges

Réfection du bloc sanitaire au centre de loisirs les millains2025 · maximum over 10 months42€kConstruction d’un centre municipal de santé2024 · maximum over 12 months73€kPolice municipale avaricum extension des vestiaires2022 · maximum over 10 months66€k
Contract details (procedure, price, amendments, lots)

Procedure : Appel d'offres ouvert

Price : Forfaitaire

Published amendments : 2

Subcontracting declared : no

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.