Skip to main content

Public contracts of Bournezeau · 2023 · Construction and buildings

Travaux de réhabilitation et d’extension de la mairie

Couverture étanchéité

€104k
maximum contract amount over 15 months — what was paid on it is not published
Signed on 6 November 2023 · ended around February 2025 · 15 months

That is at most ~€83k a year on average: a maximum too.

Company selected

Entreprise PeteTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office Bournezeau (85480) · headcount 20 to 49 employees · SIREN 327835138

Number 12 by amount of the 15 contracts Bournezeau published for 2023. It belongs to the policy Administration and shared services.

Other contracts of Entreprise Pete in Bournezeau

Réhabilitation et extension de la mairie : gros œuvre2023 · maximum over 15 months611€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Forfaitaire

Published amendments : 14

Subcontracting declared : yes

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.