Supplier of Bozel · Construction and buildings
Greffier
Greffier holds one public contract awarded by Bozel in 2022. That is 3% of the value of the contracts the town awarded in 2022.
head office in Barby (73) · 0 employees · Travaux de revêtement des sols et des murs · SIREN 448566737
€64k
at most, over the whole term of the contracts awarded by Bozel in 2022
Its contracts in Bozel
Maximum amount of each contract, over its whole term: not what was paid.
Rénovation groupe scolaireLots 08 sols souples · 2022 · maximum over 12 months · Simplified procedure€64k