Supplier of Bréal-sous-Montfort · Construction and buildings
B.S.
B.S. holds 3 public contracts awarded by Bréal-sous-Montfort between 2024 and 2025. That is 4% of the value of the contracts the town awarded over the period.
head office in Breal-Sous-Montfort (35) · 10 to 19 employees · Travaux d'installation d'eau et de gaz en tous locaux · SIREN 491103735
Its contracts in Bréal-sous-Montfort
Maximum amount of each contract, over its whole term: not what was paid.
L’opération concerne la rénovation de trois grands pôles…Le pôle Accueil · Le pôle Proximité avec le Hall d’entrée · La… · 2025 · maximum over 18 months · at most ~€24k a year on average · Simplified procedure€35kTravaux de construction d’un foyer des jeunesPlomberie · Chauffage · Ventilation · 2024 · maximum over 21 months · at most ~€46k a year on average · Simplified procedure€81kConstruction foyer des jeunesPlomberie chauffage ventilation · 2024 · maximum over 11 months · Simplified procedure€81kYear by year
Elsewhere in France
B.S. holds contracts in 7 towns, worth €1M at award.