Skip to main content

Public contracts of Brech · 2023 · Construction and buildings

Démolition, gros œuvre, voirie et réseaux

€729k
maximum contract amount over 20 months — what was paid on it is not published
Signed on 10 May 2023 · ended around January 2025 · 20 months

That is at most ~€437k a year on average: a maximum too.

Company selected

Bat'Isole ConstructionTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office Mellac (29300) · headcount 20 to 49 employees · SIREN 753104504

A contract awarded to 2 holders; above, the main holder. The amount is the whole contract’s: the DECP does not publish each holder’s share.

Number 4 by amount of the 43 contracts Brech published for 2023. It belongs to the policy Streets and transport.

Other contracts of Bat'Isole Construction in Brech

Construction d’un centre culturel à Brec’h2023 · maximum over 22 months729€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Mixte

Published amendments : 8

Subcontracting declared : yes

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.