Skip to main content

Public contracts of Breteuil · 2021 · Construction and buildings

Construction d’un groupe scolaire à performance énergétique à La Gueroulde

€129k
maximum contract amount over 15 months — what was paid on it is not published
Signed on 3 June 2021 · ended around September 2022 · 15 months

That is at most ~€103k a year on average: a maximum too.

Company selected

Duchesne ÉlectricitéTravaux d'installation électrique dans tous locaux · registered office Verneuil d'Avre et d'Iton (27130) · headcount 10 to 19 employees · SIREN 418513941

Number 22 by amount of the 40 contracts Breteuil published for 2021. It belongs to the policy Schools.

Other contracts of Duchesne Électricité in Breteuil

Duchesne2021 · maximum over 15 months138€kÉlectricité2020 · maximum over 17 months168€kDuchesne2020 · maximum over 6 months54€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Révisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.