Via Guisane : passerelle piétonne et cyclable sous le pont de la RN 94

€302k
maximum contract amount over 5 months — what was paid on it is not published
Signed on 13 November 2019 · ended around April 2020 · 5 months

Company selected

Masse Constructions MetalliquesTravaux de menuiserie métallique et serrurerie · registered office Briancon (05100) · headcount 20 to 49 employees · SIREN 343876793

A contract awarded to 3 holders; above, the main holder. With it: Entreprise Blanchard, Millet. The amount is the whole contract’s: the DECP does not publish each holder’s share.

Number 4 by amount of the 45 contracts Briançon published for 2019.

Other contracts of Masse Constructions Metalliques in Briançon

Métallerie-serrurerie2025 · maximum over 4 months64€kMétallerie-serrurerie2025 · maximum over 4 months60€kCharpente, avec résille métallique perforée sur peau extérieure2022 · maximum over 3 months379€k
Contract details (procedure, price, amendments, lots)

Procedure : Dialogue compétitif

Price : Révisable

Published amendments : none