Supplier of Briare · Construction and buildings
S 3 C
S 3 C holds one public contract awarded by Briare in 2019.
head office in Briare (45) · 10 to 19 employees · Travaux d'installation d'eau et de gaz en tous locaux · SIREN 385160056
€14k
at most, over the whole term of the contracts awarded by Briare in 2019
Its contracts in Briare
Maximum amount of each contract, over its whole term: not what was paid.
Aménagement d’une maison éclusière en gite2019 · maximum over 6 months · Simplified procedure€14kElsewhere in France
S 3 C holds contracts in 2 towns, worth €69k at award.