Skip to main content

Public contracts of Bully-les-Mines · 2019 · Construction and buildings

Travaux de réfection de toiture en ardoise : préau de l'école Louise de Bettignies

€36k
maximum contract amount over 12 months — what was paid on it is not published
Signed on 10 January 2019 · ended around January 2020 · 12 months

Company selected

CCSTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office Bully-Les-Mines (62160) · headcount 10 to 19 employees · SIREN 437690746

Number 8 by amount of the 10 contracts Bully-les-Mines published for 2019. It belongs to the policy Schools.

Other contracts of CCS in Bully-les-Mines

Couverture de la mezzanine du complexe sportif Pierre Mauroy2025 · maximum over 12 months235€kToiture terrasse de l’école Victoire Lampin2025 · maximum over 12 months36€kTuiles2019 · maximum over 12 months23€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.