Public contracts of Caen · 2020 · Construction and buildings

Construction d’une MJC, quartier de Venoix : gros œuvre et ravalement

€1.3M
maximum contract amount over 15 months — what was paid on it is not published
Signed on 3 January 2020 · ended around April 2021 · 15 months

That is at most ~€1.1M a year on average: a maximum too.

Company selected

Spie Batignolles Abscis-BertinConstruction d'autres bâtiments · registered office Bretteville-Sur-Odon (14760) · headcount 100 to 199 employees · SIREN 433547528

Number 2 by amount of the 31 contracts Caen published for 2020.

Other contracts of Spie Batignolles Abscis-Bertin in Caen

Gros œuvre2025 · maximum over 18 months872€kRestructuration2025 · maximum over 9 months526€kMaçonnerie / Gros œuvre / carrelage2025 · maximum over 11 months123€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Révisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.