Skip to main content

Public contracts of Caluire-et-Cuire · 2020 · Construction and buildings

Travaux de mise en conformité accessibilité école maternelle pierre et marie curie

€10k
maximum contract amount over 4 months — what was paid on it is not published
Signed on 11 March 2020 · ended around July 2020 · 4 months

Company selected

—Travaux de menuiserie bois et PVC · registered office Miribel (01700) · headcount 6 to 9 employees · SIREN 491380614

Number 55 by amount of the 56 contracts Caluire-et-Cuire published for 2020. It belongs to the policy Schools.

Other contracts of in Caluire-et-Cuire

Restructuration partielle des locaux du c.c.a.s de Caluire-et-Cuire2021 · maximum over 5 months14€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme et actualisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.