Skip to main content

Public contracts of Cannes · 2020 · Construction and buildings

Travaux de requalification et d’embellissement du Boulevard Eugène Gazagnaire

Phase 2 : Mourre rouge-Gould

€2.4M
maximum contract amount over 7 months — what was paid on it is not published
Signed on 9 November 2020 · ended around June 2021 · 7 months

Company selected

Sogea Environnement PACA (Agence du Cannet)Construction de réseaux pour fluides · registered office Le Cannet (06110) · headcount 50 to 99 employees · SIREN 814732798

Number 2 by amount of the 132 contracts Cannes published for 2020. It belongs to the policy Streets and transport.

Other contracts of Sogea Environnement PACA (Agence du Cannet) in Cannes

Travaux de voirie chemin du béal aménagement d’un parking2026 · maximum over 4 months914€kTravaux de voirie chemin du Béal et aménagement d’un parking2026 · maximum over 3 months914€kTravaux aménagement rue hibert2026 · maximum over 7 months774€k
Contract details (procedure, price, amendments, lots)

Procedure : Appel d'offres ouvert

Price : Ferme et actualisable

Published amendments : 1

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.