Castelnaudary: spending by policy area · 2025
Culture, sport and youth
€6.3M
29% of 2025 spending · €494 per resident
€3.8M in 2024
Breakdown of this item’s spending
Click a line to see what it is made of
The 7 other items (6%)
Largest works since 2023
Click a building site to see the contract
- Réhabilitation de la piste d’athlétisme et du terrain stabilisé, stade Pierre de Coubertin2025 · Art-Dan€1.2M
- Construction hors site d’un bâtiment pérenne de vestiaires sportifs : bâtiment modulaire2025 · Smart Cells€151k
- Construction hors-site d’un bâtiment pérenne à usage de vestiaires sportifs2025 · Guilhot et Fils€36k
Who won this item’s contracts since 2023
Compared with towns of the same size
28% of the town’s running costs goes to this item. Towns of the same size: 19.1%.
Source: the town’s 2025 accounts (DGFiP), by public policy. Amounts paid in the year. Works and companies: published contracts, amounts at signature. See the source